2 views from the inside. the trusses are up and the sheathing is going on.
the 2 short walls are up. the trusses are all up, only two were not up when i took this photos.
it’s huge!
the walls are getting built. the plan is to tilt them up tomorrow.
i milled up the birch log with the new chainsaw mill, it’s a lot of work.
the sill plate is in.
the back filling is done on 2 sides, the framing has arrived, and the gravel and ducting are in ready for the concrete floor slab.
the drain rock is in around the perimeter. framing should start on Tuesday.
the stem wall is in, and the forms are off.
i picked up two chainsaw mills tonight, a 36″ and a 48″.